Call: (512) 288-5522

Innovative SWPPP Solutions Save You Time & Money

At BPI Partners, Inc., we’re not just another environmental and civil construction company but your partners in building a sustainable future. Specializing in large-scale development projects, our team of seasoned experts offers a comprehensive suite of services, including advanced erosion control, stormwater management, water quality ponds, street sweeping, and more, tailored to the unique challenges of Austin, TX, and the surrounding areas.

The Innovative SWPPP Solutions Difference

Without BPI

Without BPI, Mobilization, Construction, De-mobilization, Reclamation, Acceptance

Comprehensive construction and project maintenance programs throughout the lifetime of the development project to ensure water quality and water detention ponds are built right and maintained the first time … ever time.

With BPI

With BPI: Consulting, Mobilization, Construction, Active Project Maintenance, Acceptance, Post Project Maintenance

Meeting Regulatory Requirements With Our Help

The Texas Commission for Environmental Quality (TCEQ) enforces requirements for erosion control, maintenance, and revegetation in construction and development projects through the Texas Pollutant Discharge Elimination System (TPDES) Program.

A Stormwater Pollution Prevention Plan (SWP3), which includes Erosion and Sediment Control (ESC) and other measures to limit stormwater runoff pollution from construction activities, is required by the Texas Commission on Environmental Quality (TCEQ) as well as Travis County and the surrounding areas for certain types of construction.

What Projects Require SWP3 Plans?

Understanding the requirements for a Storm Water Pollution Prevention Plan (SWPPP) is crucial for any development project. A SWPPP is typically necessary for projects that disturb 1 acre or more of land. However, it’s also important for smaller projects under 1 acre if they are part of a larger subdivision or a phased development plan. This is often referred to as being part of a ‘common plan of development’. 

It’s essential to note that even in cases where a formal SWPPP is not mandated, employing Best Management Practices (BMPs) is still required. These practices are vital for preventing negative runoff impacts on adjacent properties, local waterways, and county rights-of-way. Our commitment to environmental responsibility and regulatory compliance ensures that each project, regardless of size, adheres to the highest standards of environmental protection and sustainability.

TCEQ Requirements on Pond Maintenance

BPI maintenance programs provide all these required services.

SWPPP FACT: Did you know that TCEQ fines for SWPPP non-compliance can be as much as $25,000 per day per violation depending on the severity of the violation?

TCEQ Requirements

Assistance Through All Phases Of Project Development

01

Design & Engineering

02

Project Solicitation

03

Site Development

04

Vertical Construction

05

Municipality Acceptance

06

HOA / MUD Maintenance

Benefits to MUD Developments

Environmental and erosion control measures on your project are reimbursable to the developer. Reimbursable items related to the environmental and erosion controls within a MUD can include:

  • Design and Engineering Costs
  • Permitting and
  • Compliance Costs
  • Construction Costs
  • Maintenance Costs
  • Monitoring and reporting costs
  • Restoration and reclamation costs
  • Consulting Costs

BPI Is Your Pathway to Reimbursement

A critical component of reimbursements is final acceptance of water quality ponds including: Filtration, Biofiltration, Wet, and Detention. BPI’s phased environmental development option and continued maintenance program ensures timely acceptance by the MUD or other governing agency.

Our Innovative SWPPP Solutions From Start To Finish

Design & Consulting

Construction & Re-vegetation

Active Project Maintenance

Final
Acceptance

Post Project Maintenance

Contact Us Today To Get Started

As you navigate the complexities of environmental compliance and sustainable construction in Central Texas, remember that you’re not alone. BPI Partners, Inc. is here to guide you through every phase of your project, offering innovative SWPPP solutions for your developments. Our expertise in erosion control, stormwater management, and environmental protection ensures your project not only meets but exceeds regulatory standards. Reach out to us at 512-288-5522 or through our online contact form. Let’s build a greener, more sustainable world together, one project at a time.